Factory Information
- Factory: 100000㎡
- Staff: 400+
- Output: 20 million/monthly
- Delivery time: 15-35 days
- Certificate:


Plastic Tube plant area is more than 20,000 square meters, with 400 employees, 10 tube production lines and 6 laminated tube production lines. Possess production equipment: 10 tube drawing machines, 22 head injection machines, 11 printing machines, 10 silk screen printing machines, 6 hot stamping machines, 9 tail sealing machines, 9 lock cover film laminating machines, 1 sub-mother assembly machine, 3 labeling machines.


















Technological Process
Design artwork Text confirmed |
Extruding |
Heading |
Printing(silk-screen printing and offset printing) |
Process(holding,foil,sealing,hot-stamping sealing) |
Final inspection and packaging |
Cap making |
Delivery: Sea/Air transportation |